Correction Slips to
Engineering Code
(CS#28-39 since 1-28 are incorporated in 1999
reprint)
Chapter – X Para 1030
LICENSING OF
RAILWAY LANDS FOR RELIGIOUS PURPOSES.
The
phrase Rs. 100/- p.a. as appearing at para 1030 should be read as rs. 1000/-
p.a.; the full sentence to be read as follows:
In
case of railway lands licensed for use as religious places, the fee should be
recovered on a uniform rate of Rs. 1000/- per annum.
(Authority: Railway
Board’s letter No. 2002/LML/21/16 Dated10-04-2003.)
The amendments to existing Para 1102-E may be carried out as given
below:-
(i)
The figures “Rs. 5,000/- appearing in 1102-(i) may
be substituted by Rs. 50,000/-.
(ii)
The figures “Rs. 10,000/- appearing in 1102-(ii)
may be substituted by Rs. 50,000/-.
(iii)
The figures “Rs. 10,000/- appearing in 1102-(iii)
may be substituted by Rs. 50,000/-.
(iv)
The figures “Rs. 50,000/- appearing in 1102-(iv)
may be substituted by Rs. 2 lakhs.
(v)
The figures “Rs. 50,000/- appearing in 1102-(v)
may be substituted by Rs. 1 lakhs.
The amendments to existing Para 701-E may be
carried out as given below:-
(vi)
The figures “Rs. 10,000/- appearing in Ivth line
of sub-para ‘b’ may be substituted by Rs. 50,000/-.
(vii)
The figures “Rs. 50,000/- appearing in vth line of
sub-para ‘b’ may be substituted by Rs. 2 lakhs.
(viii)
The figures “Rs. 50,000/- appearing in IInd line
of sub-para ‘d’ may be substituted by Rs. 1 lakh.
(ix)
The figures “Rs. 5,000/- appearing in 1st line of
Note-1, may be substituted by Rs. 50,000/-.
(x)
The figures “Rs. 50,000/- appearing in IInd line
of Note-1, may be substituted by Rs. 2 lakhs.
(xi)
The figures “Rs. 50,000/- appearing in IIIrd line
of Note-1, may be substituted by Rs. 1 lakh.
(iii) |
For contact more than Rs:2 lakhs and up to Rs:2
crores |
|
The existing provision should be replaced with
the following: 10% of the first Rs.1 lakh, 7½% of the next Rs.1
lakh and 5% of the balance subject to the maximum of Rs.10 lakhs The amount
over and above Rs.3 lakhs to be recovered from the progressive bills of the
contractors at the rate of 10% till it reaches the required value. |
The
words and figure 'Rs.1 lakh appearing in para 1209-E may be substituted by
'Rs.2 lakhs'.
Chapter-X para 1047 (e)
Demarcation of Land
The
phrase "one-fifth of a kilometre (200 metres)" as appearing at para
1047 (e) should be read as "50(Fifty) metres", for the full sentence
to be read as follows :
Detached
marks should in no case be at a greater distance apart (centre to centre) than
50 (fifty) metres. They should be of a sustantial character, not easily
destroyed or moved by accident or mischief, and of such size and form as can be
readily found and recognized.
Para 715 – Estimates for Railway project.
The words and figures Rs.50,000/-
appearing in para 715-E may be substituted by “Rs.1 lakh”.
Chapter-XVIII para 1814
Miscellaneous Works
The
existing para No.1814 be substituted with following :
1814 - Level crossing, road
over bridges and under bridges: cost of
level crossing, road over and under bridge constructed at the time of
construction of a railway line or subsequently but within the period laid down
in the Railway Act. is chargeable to the Railway.
Add sub para 732-A below para 732 as under :
732-A : Notwithstanding the
stipulations for advance payment of charges at sliding scale mentioned above,
the parties shall be asked to deposit an amount of Rs.2000/- only, for deposit
works of value not exceeding Rs.5 lakhs, while making a request. Subsequently,
this amount shall be adjusted against the total cost of deposit work, as per
approved plans and estimates, before physical execution of the work at site.
Add para 1816 in Chapter-XVIII as under :
1816A. Construction of Rail Overbridge/Underbridge
in replacement of a manned level crossing on Build-Operate-Transfer(BOT) basis-
With a view to enlisting participation from private sector in the matter of
construction of road overbridges/underbridges, private entrepreneurs have been
permitted to build road overbridges/underbridges in replacement of existing
level crossings on BOT (build,operate and transfer)basis. Under this system,
the entrepreneur provides the full funds and builds the road overbridge/underbridge
as plans and drawings approved by the railway administration/road authority. In
turn, the private entrepreneur is permitted to levy toll on road traffic and/or
commercially exploit the space under the approaches of the bridge. The duration
and other terms and conditions for levy of the toll/commercial exploitation of
space are to be decided by the Road Authority. At the end of the agreed period,
the structure would revert back to the Road/Authority/Railway Administration.
During the contract period, the maintenance of the approaches and bridge proper
will be the responsibility of the Road Authority/private entrepreneur. After
the expiry of the contract period, the bridge portion will be maintained by the
railway administration and the approaches by the road authority at their own
cost. Railway’s liability towards maintenance of bridge proper will be limited
to two lane wide ROB/RUB only and the Road Authority will pay to the Railway
Administration maintenance charges attributable to the additional width, if
any. Before the work is taken up the Road Authority is required to execute an
agreement with the Railway Administration. Two model agreements – one to be
executed with the National Highways Authority of India and the other to be
executed with the State Government, as the case may be given in appendix.
_________________________________________________________
Add the following test in the
Notes of para 1137 of Cahpter-XI as under
3. The
above rules do not apply to works of road over bridges/road under bridges,
taken up on Build Operate & Transfer (BOT) basis in replacement of existing
manned Level Crossings.