Correction Slips to

Engineering Code

(CS#28-39 since 1-28 are incorporated in 1999 reprint)

 

Engg.Code C/S No.39 dated. 28.05.2003

 

 

Chapter – X Para 1030

 

LICENSING OF RAILWAY LANDS FOR RELIGIOUS PURPOSES.

 

          The phrase Rs. 100/- p.a. as appearing at para 1030 should be read as rs. 1000/- p.a.; the full sentence to be read as follows:

 

          In case of railway lands licensed for use as religious places, the fee should be recovered on a uniform rate of Rs. 1000/- per annum.

 

(Authority: Railway Board’s letter No. 2002/LML/21/16 Dated10-04-2003.)

 

 

Engg.Code C/S No.38 dated. 24.03.2003

 

The amendments to existing Para 1102-E may be carried out as given below:-

 

(i)                 The figures “Rs. 5,000/- appearing in 1102-(i) may be substituted by Rs. 50,000/-.

(ii)              The figures “Rs. 10,000/- appearing in 1102-(ii) may be substituted by Rs. 50,000/-.

(iii)            The figures “Rs. 10,000/- appearing in 1102-(iii) may be substituted by Rs. 50,000/-.

(iv)             The figures “Rs. 50,000/- appearing in 1102-(iv) may be substituted by Rs. 2 lakhs.

(v)                The figures “Rs. 50,000/- appearing in 1102-(v) may be substituted by Rs. 1 lakhs.

 

 

 

 

 

 

 

 

 

 

Engg.Code C/S No.37 dated. 24.03.2003

 

 

The amendments to existing Para 701-E may be carried out as given below:-

 

(vi)             The figures “Rs. 10,000/- appearing in Ivth line of sub-para ‘b’ may be substituted by Rs. 50,000/-.

(vii)           The figures “Rs. 50,000/- appearing in vth line of sub-para ‘b’ may be substituted by Rs. 2 lakhs.

(viii)        The figures “Rs. 50,000/- appearing in IInd line of sub-para ‘d’ may be substituted by Rs. 1 lakh.

(ix)            The figures “Rs. 5,000/- appearing in 1st line of Note-1, may be substituted by Rs. 50,000/-.

(x)               The figures “Rs. 50,000/- appearing in IInd line of Note-1, may be substituted by Rs. 2 lakhs.

(xi)            The figures “Rs. 50,000/- appearing in IIIrd line of Note-1, may be substituted by Rs. 1 lakh.

 

 

 

 

Advanced C/s No.36 dated. 01.11.2002

 

Para 1244 - Security Deposit

 

 

(iii)

For contact more than Rs:2 lakhs and up to Rs:2 crores

 

The existing provision should be replaced with the following:

 

10% of the first Rs.1 lakh, 7½% of the next Rs.1 lakh and 5% of the balance subject to the maximum of Rs.10 lakhs The amount over and above Rs.3 lakhs to be recovered from the progressive bills of the contractors at the rate of 10% till it reaches the required value.

 

 

 

Advanced C/s No.35 dated. 22.11.2001

 

Para 1209- E

 

          The words and figure 'Rs.1 lakh appearing in para 1209-E may be substituted by 'Rs.2 lakhs'.

 

Engg.Code C/S No.34 dated. 21.12.2001

 

Chapter-X para 1047 (e)

Demarcation of Land

 

          The phrase "one-fifth of a kilometre (200 metres)" as appearing at para 1047 (e) should be read as "50(Fifty) metres", for the full sentence to be read as follows :

 

          Detached marks should in no case be at a greater distance apart (centre to centre) than 50 (fifty) metres. They should be of a sustantial character, not easily destroyed or moved by accident or mischief, and of such size and form as can be readily found and recognized.

 

Engg.Code C/S No.33 dated. 30.01.2001

 

Para 715 – Estimates for Railway project.

 

          The words and figures Rs.50,000/- appearing in para 715-E may be substituted by “Rs.1 lakh”.

 

 

 

 

Engg.Code C/S No.32 dated. 13.12.2000

 

Chapter-XVIII para 1814

 

Miscellaneous Works

 

          The existing para No.1814 be substituted with following :

 

1814 - Level crossing, road over bridges and under bridges:  cost of level crossing, road over and under bridge constructed at the time of construction of a railway line or subsequently but within the period laid down in the Railway Act. is chargeable to the Railway.

 

 

Engg.Code C/S No.31 dated.

 

Add sub para 732-A below para 732 as under :

 

732-A : Notwithstanding the stipulations for advance payment of charges at sliding scale mentioned above, the parties shall be asked to deposit an amount of Rs.2000/- only, for deposit works of value not exceeding Rs.5 lakhs, while making a request. Subsequently, this amount shall be adjusted against the total cost of deposit work, as per approved plans and estimates, before physical execution of the work at site.

 

 

Engg.Code C/S No.30 dated. 14.11.2000

 

Add para 1816 in Chapter-XVIII as under :

 

1816A. Construction of Rail Overbridge/Underbridge in replacement of a manned level crossing on Build-Operate-Transfer(BOT) basis- With a view to enlisting participation from private sector in the matter of construction of road overbridges/underbridges, private entrepreneurs have been permitted to build road overbridges/underbridges in replacement of existing level crossings on BOT (build,operate and transfer)basis. Under this system, the entrepreneur provides the full funds and builds the road overbridge/underbridge as plans and drawings approved by the railway administration/road authority. In turn, the private entrepreneur is permitted to levy toll on road traffic and/or commercially exploit the space under the approaches of the bridge. The duration and other terms and conditions for levy of the toll/commercial exploitation of space are to be decided by the Road Authority. At the end of the agreed period, the structure would revert back to the Road/Authority/Railway Administration. During the contract period, the maintenance of the approaches and bridge proper will be the responsibility of the Road Authority/private entrepreneur. After the expiry of the contract period, the bridge portion will be maintained by the railway administration and the approaches by the road authority at their own cost. Railway’s liability towards maintenance of bridge proper will be limited to two lane wide ROB/RUB only and the Road Authority will pay to the Railway Administration maintenance charges attributable to the additional width, if any. Before the work is taken up the Road Authority is required to execute an agreement with the Railway Administration. Two model agreements – one to be executed with the National Highways Authority of India and the other to be executed with the State Government, as the case may be given in appendix.

_________________________________________________________

 

Engg.Code C/S No.29 dated. 14.11.2000

 

Add the following test in the Notes of para 1137 of Cahpter-XI as under

 

3.       The above rules do not apply to works of road over bridges/road under bridges, taken up on Build Operate & Transfer (BOT) basis in replacement of existing manned Level Crossings.