Assets UNDER Pr. Chief Engineer, SE Railway
Route length on Broad Gauge
(1676mm) system (Km)
|
2273.194 |
|
Route
length on Narrow Gauge (762mm) system (Km) |
158.508 |
|
Total
Route length on S.E. Railway (Km) |
2431.702 |
|
Track
Kilometer length on Broad Gauge system (Km) |
6102.676 |
|
Track
Kilometer length on Narrow Gauge system (Km) |
169.963 |
|
Total
Track Kilometer on S.E.Railway system (Km) |
6272.639 |
|
No.
Of Railway stations |
301 |
No. Of
Level Crossings-Manned
|
430 |
|
No.
Of Level Crossings-Unmanned |
1507 |
|
No.
Of Road over Bridges |
87 |
|
No.
Of Road under Bridges |
42 |
|
Plinth
area of Public/Service buildings (Sqm) |
3028212 |
|
Plinth
area of Residential Buildings (Sqm) |
2715903 |
|
No
of Major Bridges |
430 |
|
No
of Minor Bridges |
6170 |
|
No.
of Important Bridges |
14 |
|
No
of Tunnels |
05 |
Total
Length of Tunnels (Kms.)
|
1.973 |