INDEX
OF CE’S CIRCULARS (SERIAL NUMBERWISE) |
|
CE’s
Circulars No. |
Date |
Subject |
1 |
01.01.76 |
Policy reg. Issuing of CE's
circular |
2 |
17.02.76 |
Jt. Engg. Optg. & Elect.
Procedure order |
3 |
18.02.76 |
Ex.B.N.Rly.'s circular |
4 |
1976 |
Maintennace of Bridge and tunnel
Register Annual certification |
5 |
24.05.76 |
Payment of final bills and
refund of security deposit |
6 |
03.11.76 |
Maintenance of section registers
by inspectors of works |
7 |
1977 |
Provision of work charged
Establishment in the Track renewal estimate |
8 |
27.01.77 |
Standard drawing for Cant.
Board (B.G. & N.G.) in metric system |
9 |
21.02.77 |
Supplementary instructions to
Indian Way & Works Manual |
10 |
07.03.77 |
Track recording and oscillograph car runs |
11 |
07.06.77 |
Maintenance of Bridge and
Tunnel Registers Annual certificate |
12 |
06.07.77 |
Verification and preparation
of yearly statement of infringements |
13 |
13.07.77 |
Employment of casual labour
at two different units |
14 |
1977 |
Para 1601 of IRPWM amendment
of |
15 |
19.08.77 |
Revised schedule of
Inspection and inspection charge of Pvt. Sidings to be realised from siding
holders w.e.f.01.04.77 |
16 |
08.03.78 |
Execution of earth workd |
17 |
1978 |
Recovery of rent of staff
quarters |
18 |
26.06.78 |
Provision of General charges in
revised estimates |
19 |
20.11.78 |
Concrete slabs of Foot over
bridges |
20 |
04.04.79 |
Issue of critical materials
cement, steel etc. to the contracts |
21 |
16.04.79 |
Recording of certificate on
contractors bills for works contracts |
22 |
20.04.79 |
Review committee on
arbitration recommendation |
23 |
01.06.79 |
Maintenance of combination fish
plates for 52 kg/90 R Rail section |
24 |
18.10.79 |
Low cost Housing |
25 |
13.11.79 |
Maintenance of track with
shorts welded Rails |
26 |
04.02.80 |
Track manitenance Gang charts
and Diaries. |
27 |
10.03.80 |
Laying and maintenance of
short welded rails |
28 |
17.03.80 |
Posting in the DMTR for
receipts and issues of materials |
29 |
22.03.80 |
Notes on inspection of track
on girder bridges sailent features prepared by IRIATT, Pune |
30 |
24.03.80 |
Minimum distance of Planning
Structure of Planning by the side of Railway track |
31 |
30.04.80 |
Recovery of hire charges for
plant machinery given to contractors |
32 |
01.05.80 |
Location of contractors
sheds, store houses and yards for stocking railway materials |
33 |
06.05.80 |
Optimum utilisation of P.Way
materials available with Divns. |
34 |
17.07.80 |
Prov. Of latrines for use of
switchman and other staff employed in the cabins |
35 |
03.10.80 |
Preventive check-conducted by
I.I. Of vig. Directorate at the office of AEN/II, Raipur on 18.04.80 |
36 |
24.10.80 |
Painting of old doors &
windows |
37 |
29.11.80 |
Rail fractures |
38 |
05.12.80 |
Schedule of Inspection Reg.
Points & Crossings, curves, creep and infringements |
39 |
20.02.81 |
Assistant Engineer's Bridge
Inspection register |
40 |
05.05.81 |
Journal of daily duties of
works staff |
41 |
15.05.81 |
Joint procedure order for
formation of decorum cum order committee for Rly. Colonies |
42 |
01.07.81 |
Buckling of Track and
adjustment of creep |
43 |
07.07.81 |
Planning & Execution of
works by CE( C )/BSP & GRC |
44 |
22.07.81 |
Memorandum Manitenance of DMTR |
45 |
25.07.81 |
Revised inspection charges of
private sdgs to be realised from sdg. Holders w.e.f.01.04.81 |
46 |
01.08.81 |
Provision of work charged
Establishment in the Track renewal estimate |
47 |
10.10.81 |
Supplementary instructions to
para 671 od way & works Manual in regard to ballast depot & balance |
48 |
18.11.81 |
Early Steel/wrought Iron girders
detailed inspection |
49 |
30.11.81 |
Tie Tamping machine precaution
to be taken in moving from place to place |
50 |
18.10.82 |
Temporary arrangement for Girder
Bridges |
51 |
23.10.82 |
Safety to be adopted while
working in the vicinity of 25 KVOHE line |
52 |
14.01.83 |
Painting of Bridge Girders |
53 |
06.04.83 |
Requirement of Relieving
girders and plants & machineries for Bridge Rehabilitation works |
54 |
22.04.83 |
Equipment of keyman |
55 |
25.05.83 |
Pressure Grouting machines |
56 |
18.07.83 |
Leavy of maintenance charges for
the road over bridges constructed by Rly. & State Govt. in replacement of
existing level xing |
56A |
01.08.83 |
Amendment to S.1611 maintenance of Level Xing |
57 |
18.07.84 |
Instrument required for
checking the quality of pointing in steel structures |
58 |
10.02.84 |
White washing/colour washing
Distempering/Snowcem etc. of Residential Building of staff quarter and
officers and officers Bunglow and service Building |
59 |
20.03.84 |
Check list important safety
items pertaining to Civil Engg. Deptt. |
60 |
20.03.84 |
Laying and maintenance of
Short welded rails |
61 |
30.03.84 |
Deficiencies on manned level
crossing to ensure safety |
62 |
21.06.84 |
Amendment to S.1611 maintenance of Level Xing |
63 |
26.09.84 |
Overhauling of Track |
64 |
28.09.84 |
Tentative recommendation of
CRS, SE Circle in connection with accident of 4 GI Passenger on 16.08.84 bet
Charegaon-Samnapur on Jabalpur-Gondia line |
65 |
17.11.84 |
P.Way contracts |
66 |
20.11.84 |
Supplementary instructions to
the Indian Rly's way & works Manual |
67 |
14.02.85 |
Check list of items pertaining
to Engg. Deptt. |
68 |
21.02.85 |
Accident on manned /unmanned
level Xing action to be taken |
69 |
05.03.85 |
Works pertaining to track |
70 |
19.03.85 |
Use of rails screw and
provision of bearing plates at the level xing and maintenance of sand humps |
71 |
20.03.85 |
Maintenance of points
crossings |
72 |
20.03.85 |
Duties of patrolmen |
73 |
30.03.85 |
Verification of stores &
records of DSC depot of the Divisions |
74 |
12.04.85 |
Prevention of buckling of track
precautions for maintenance of track |
75 |
30.05.85 |
Wear of rails on curves |
76 |
13.06.85 |
Joint Engineering, Electrical
& Operating circular on weather warning |
77 |
21.06.85 |
Protection of track during
casual renewals |
78 |
24.06.85 |
Afforestation and
encroachment |
79 |
25.06.85 |
Workmanship in concrete bridge
construction |
80 |
01.07.85 |
Level Xing special precautions |
81 |
01.08.85 |
Maintenance of level Xing within
station limits |
82 |
13.09.85 |
Plantations along the Rly. Track
detention of trains |
83 |
08.11.85 |
Track Maintenance |
84 |
26.11.85 |
Gang Charts and diaries |
85 |
04.12.85 |
Maintenance of Electric Loco
running and repair sheds |
86 |
04.12.85 |
Derailment |
87 |
14.12.86 |
Revised inspection
charges of private sdgs |
88 |
19.03.86 |
Revised inspection charges
for private sidings of steel plants |
89 |
28.04.86 |
Provision of protection works
for bridges |
90 |
30.04.86 |
Prevention of
Buckling of track precautions |
91 |
18.11.86 |
Guidance for signing of
certificate for bridge register |
92 |
24.11.86 |
Report on derailment of 77 up
Utkal Express |
93 |
04.02.87 |
Passenger Amenity works and
other building on platforms |
94 |
05.06.87 |
Inspection and maintenance of
distressed bridges |
95 |
15.07.87 |
Drive from 20.07.87 to
31.07.87 to check effectiveness of monsoon patrolling |
96 |
17.07.87 |
Submission of bridge
inspection registers |
97 |
04.09.87 |
Track on bridges |
98 |
09.02.89 |
Increasing the permissible
speed over modern turnouts/turn-outs provided with curved switches |
99 |
13.02.89 |
Restoration of track after
accident |
100 |
26.10.89 |
Precaution regarding Derailment |
101 |
16.11.89 |
Track machines |
102 |
28.02.90 |
Yards and crossing stations |
103 |
10.08.90 |
Gang strength |
104 |
27.06.90 |
Unmanned level xing |
105 |
24.03.90 |
Prevention of rail and fractures |
106 |
20.09.90 |
Welding of VIC Gr.A (90 UTS)
Rail |
107 |
01.10.90 |
Strengthening of track in
approaches of all Major/important bridges on B.G. |
108 |
1990 |
Track Drainage |
109 |
06.11.90 |
Safety precarsion at worksite |
110 |
|
Rail joints-Fishplated, welded
and shed |
111 |
29.01.91 |
Use of single coil spring
washers in track |
112 |
13.02.91 |
The standard practice of key
driving in different types of sleepers |
113 |
19.02.91 |
Monitoring of track Geometry and
ride quality |
114 |
25.03.91 |
Working of rail dollies |
115 |
30.04.91 |
Formation width standards for |
116 |
21.05.91 |
Jt. Traffic & Engg. Circular
reg. Traffic blocks |
117 |
05.06.91 |
Utilisation of steel through
sleeper of straight switch trun-outs in curved switch layouts of Turnouts |
118 |
28.08.91 |
Demarcating & verification
of Rly. Boundries & maintenance of records |
119 |
|
not issued |
120 |
16.10.92 |
Test checks on measurement and
quality ballast |
121 |
09.05.94 |
Track laying quality control and
handing/taking over bet. Maintenance unit and construction of Track renewal
units |
122 |
30.05.94 |
Track Drainage |
123 |
07.06.94 |
Demanning of existing manned
level crossing |
124 |
07.07.94 |
Construction at New un-manned
level crossings |
125 |
08.07.94 |
O'
Missing Fittings Gang |
126 |
21.07.94 |
Contracts for miscellaneous
Track works |
127 |
07.02.95 |
Gang charts and diaries Books |
128 |
07.02.95 |
Duties of Keyman |
129 |
10.02.95 |
Incresase of Speed on Turnout
and loop lines to 30 Kmph |
130 |
09.06.95 |
Pre-monsoon works & Monsoon
precaution |
131 |
21.08.95 |
Instruction in connection with
the submission of Br. Inspection registers contained in CE's circular No.96
at 1987 |
132 |
21.09.95 |
Working of Push Trollies and
lorries |
133 |
28.02.96 |
Recording of Rail Temperature |
134 |
26.03.96 |
Periodical examination of Motor
Trolley |
135 |
01.05.96 |
Contracts for miscellaneous
Track works |
136 |
25.07.96 |
Inspection of track by window
Trailing/foot plate by AEN, DEN/Sr.DEN on this section |
137 |
04.03.98 |
Directed maintenance of building |
138 |
25.03.98 |
Procedure for accountal &
disposal of released (SH-scrap) track materials |
139 |
24.03.98 |
Inspection of structural steel
& timber works by AEN & IOWs |
140 |
25.03.98 |
Maintenance and cleaning of
water storage tanks |
141 |
29.04.98 |
Oiling & greasing of SEJs |
142 |
09.07.98 |
Restriction to be imposed at the
site of TRT working |
143 |
09.07.98 |
Utilisation of damaged PSC
sleeper |
144 |
09.07.98 |
Attention to track at work spot |
145 |
31.07.98 |
Visibility requirement along the
track for road users at unmanned LCs |
146 |
12.08.98 |
Granting of way leave
facilities/easement right policy regarding |
147 |
19.08.98 |
Test check of ballst
measurements to be carried out by Sr.DENs/DENs in-charge of the section |
148 |
20.10.98 |
Track renewal proposal for works
programme |
149 |
10.11.98 |
Issue of OES caution order |
150 |
24.12.98 |
Track works requiring
block/speed restriction |
151 |
28.01.99 |
Greasing of rail gauge-face on
curves |
152 |
1.01.99 |
Project report for track renewal
works |
153 |
18.01.99 |
Use of spring setting devices
(SSD) on curved switches |
154 |
22.02.99 |
Joint procedure order on
sanitation of stattions and railway colonies (for cleanliness) |
155 |
10.02.99 |
Negotiation in works tender |
156 |
04.02.99 |
Greasing of ERC and measurement
of toe load of ERC |
157 |
12.04.99 |
Protection of AT welds |
158 |
19.02.99 |
Procedure order for detection,
prevention & removal of encroachment of Railway land in S. E. Railway |
159 |
18.02.99 |
Display of station name at
stations |
160 |
31.03.99 |
Formation of colony care
committee |
161 |
03.10.99 |
Execution of P.Way work through
contractual agency |
162 |
03.12.99 |
Re-organisation of track machine
organisation |
163 |
22.06.99 |
Screening of Ballast |
164 |
22.10.99 |
Procedure of execution of deep
screening |
165 |
04.05.99 |
Maintenance of concrete sleeper
track |
166 |
23.04.99 |
Guidelines for dealing with
cases on licensing of Railway land for short duration |
167 |
23.04.99 |
ESO No.1, Policy of issue of
ESOs |
168 |
23.04.99 |
ESO No.2, Lebel crossing, ROB
and RUB |
169 |
23.04.99 |
ESO No.3, Procurement of rails,
rail fracure & USFD |
170 |
23.04.99 |
ESO No.4 on siding matters |
171 |
23.04.99 |
ESO No.5, Procurement of
sleepers & fittings |
172 |
23.04.99 |
ESO No.6, Track machines &
track monitoring |
173 |
23.04.99 |
ESO No.7 Not issued |
174 |
23.04.99 |
ESO No.8, On Metropolitan
Transport Project |
175 |
23.04.99 |
ESO No.9, On negotiations |
176 |
23.04.99 |
ESO No.10, On contract policy |
177 |
23.04.99 |
ESO No.11, on Passenger
Amenities |
178 |
23.04.99 |
ESO
No.12, Compendium of instructions on Rest Houses, Schools, water supply,
Housing |
179 |
10.05.99 |
Submission and scrutiny of AENs
Bridge inspection register |
180 |
15.06.99 |
Training of Gangmen, Mate,
Keymen and Gatemen in Divisional Engineering Training School |
181 |
06.07.99 |
Unloading and stacking of P.Way
material on cess avoiding of infringement |
182 |
06.07.99 |
Inspection of vulnerable cutting
& water way of bridges prior to Monsoon, certificate regarding |
183 |
15.07.99 |
Yardsticks for small machines
with in-charge PWIs |
184 |
15.07.99 |
Yardsticks for Engg. Material in
Accident Relief Trains |
185 |
06.08.99 |
Procedure order for executing
track renewal work by independent w/c PWI (Track laying unit) |
186 |
16.08.99 |
Provision of short check rail
ahead of toe of switches in points & x-ing on curve |
187 |
25.08.99 |
Distribution of important
circulars, correction slip to manuals etc.- Assurance register |
188 |
25.08.99 |
Restriction to imposed at the
site of TSR work with PSC sleeper by PQRS |
189 |
25.08.99 |
Placing of temporary Engg.
Indicators in case of mulitiple restriction at track renewal works |
190 |
07.10.99 |
PVC pipes fpr plumbing in
corrosion-prone areas |
191 |
11.10.99 |
Prevention of corrosion in the
steel members of foot over bridges, steel trestles and columns of PF |
192 |
08.10.99 |
Guidelines for the quality
control and chlorination of water for drinking and domestic use |
193 |
22.10.99 |
Water proofing of building &
structures |
194 |
09.11.99 |
Compendium of instructions on
railway land leasing, licensing, encroachment, afforestations |
195 |
11.11.99 |
Management of zonal contract
(p.Way), delay finalisation of zonal tender |
196 |
12.11.99 |
Location of derailing switches |
197 |
01.12.99 |
Compendium of accidents |
198 |
03.12.99 |
Painting of rail and weld collar |
199 |
31.12.99 |
Water storage tank in the
coastal area |
200 |
01.01.00 |
Master revision circular
deletion of earlier CE's circulars |
201 |
01.01.00 |
Layout plans of distribution
system in connection with water supply in Railway complex |
202 |
24.01.00 |
Inspection of over-head steel
structures across the track erected by non-railway organisations |
203 |
25.01.00 |
Opening of tenders |
204 |
11.02.00 |
Bridge inspection by
AENs-Quarterly monitoring of compliance |
205 |
06.04.2000 |
Train operation during fog-line
marking access track at sighting broad during winter. |
206 |
10.04.2000 |
Joint procedure order on single
line working for Engg. Block in double line Sec. |
207 |
05.05.2000 |
Keyman’s daily Track Patrolling. |
208 |
05.05.2000 |
Laying of PRC Fan shaped
Turnouts. |
209 |
25.05.2K |
Maintenance of Pvt. Sidings. |
210 |
20.07.2000 |
Measurement of distilling works
on rider bed. |
211 |
25.07.2K |
River & Flood Register. |
212 |
02.08.2000 |
Supply of drinking water to the
traveling public at Railway stations. |
213 |
19.09.2000 |
Working of temping machine in
design mode. |
214 |
28.09.2000 |
Safety at work site. |
215 |
10.10.2000 |
Maintenance of Stores Records in
the units of Sr. Subordinates in the Civil Engineer Department. |
216 |
06.11.2000 |
Inspection of Flood, Light
Towers. |
217 |
22.11.2000 |
Works Programme proposal. |
218 |
27.11.2000 |
Preparation of drawing for
execution Civil Engineering Works. |
219 |
29.11.2000 |
Taking over of new assets from
the construction organization. |
220 |
12.02.2001 |
LWR Plans. |
221 |
08.03.2001 |
Quality of Channel Sleepers. |
222 |
08.03.2001 |
Earthquake resistance building
& structure. |
223 |
25.04.2001 |
Rail renewal on major and
important Bridges |
224 |
02.11.2001 |
Inspection maintenance and
replacement of cast Iron Helical Staircases. |
225 |
05.11.2001 |
Durability of plain and
Reinforced Cement Concrete Structures. |
226 |
06.11.2001 |
Inter divisional movement of
Track Machines. |
227 |
06.12.2001 |
Use of croqueted Aluminum
roofing shuts. |
228 |
01.01.2002 |
Design on Buildings structure |
229 |
5/18.02.2002 |
Corrective measures for
continuing defective welds in track. |
230 |
25.2.2002. |
Guide lines for dealing with
case granting of way leave facilities/croachment rights on Railway land. |
231 |
22.02.2002 |
Destressing of LWR on PSC
Sleeper at lower temperature for reduce weldfailures. |
232 |
02.03.2002 |
Inspection of Bridges by
Sectional Sr. DEN/DEN. |
233 |
18/26.03.02 |
Management of Tenders and
contracts in Division. |
234 |
04.04.2002 |
Protecting at welds by providing
joggled fishplates in the aproaches of major bridges. |
235 |
08.04.2002 |
Prevention of
seizure/corrosion of ERC. |
236 |
11.04.2002 |
End cropping and welding of
Rails. |
237 |
14.05.2002 |
Annual confidential Report of
Contractors. |
238 |
12/18.06.02 |
Visual Examination fish
plate/welds rail joints and other weake cushionsin rail. |
239 |
24.06.2002 |
Safety precarsion at worksite in
proximity to running track. |
240 |
12/15.07.02 |
Procedure order for detection,
prevention & removal of encroachment of Railway land in S. E. Railway |
241 |
18.07.2002 |
TGI Value. |
242 |
17.10.2002 |
Inspection and maintenance of
steel Channel sleepers laid on girder Bridges. |
243 |
19.03.2003 |
Monitoring and analysis of
Rail/Weld fractures. |
244 |
20.3.2003 |
Inspection of breathing lrngth
& SEJ on LWR by Sr.DEN/DENs of the section AND Recording of Fractures and
cuts in LWR alongwith Rail Temperatures |
245 |
1/5.04.2003 |
Special Pay to Gatekeepers of
Engineering Department |
246 |
11.07.2003 |
Prevention of Accidents at Work
Sites |
247 |
29.07.03 |
Inspection of Cross Over |
248 |
06.08.2003 |
Department Welder wise
performance for Alumino-Thermic welding |
184A |
18.09.2003 |
Preparedness for restoration of
track after accidents |
249 |
18.12.2003 |
Metallisation of flooring system
of open web girders and footbover bridges |
250 |
05.05.2004 |
Installation
of Hectometer post along the track |
251 |
16.07.2004 |
Speed
Breaker with correct geometry of raod surface at Level Crossing |
|
|
|